current location: Index About Us Member units Content

China Water Resources and Hydropower Third Engineering Bureau Co., Ltd. 

View:timesRelease Date:2024年07月23日 10:00

China Water Resources and Hydropower Third Engineering Bureau Co., Ltd. (hereinafter referred to as "China Hydropower Third Engineering Bureau"), established in the 50s of the last century, is a key member of the world's top 500 enterprises - China Power Construction Group (Co., Ltd.). Focusing on "water, energy, city and data", Sinohydro III is an industry-leading comprehensive service provider of civil engineering, urban construction, assembly and manufacturing, and professional engineering with integrated service capabilities for the whole industrial chain of pre-consulting, survey and design, investment and financing, construction and construction, equipment manufacturing, and operation management.

The Third Bureau of China Hydropower has the first-class qualification for general contracting of water conservancy and hydropower project construction, the first-class qualification for general contracting of construction engineering, municipal public works, electric power engineering, mechanical and electrical engineering, mining engineering, etc., and 16 professional contracting first-class qualifications such as steel structure, building decoration and decoration, building mechanical and electrical installation, environmental protection, fire protection facilities, electronics and intelligence, foundation foundation, lifting equipment installation, urban and road lighting, building curtain wall, ancient buildings, bridges, tunnels, power transmission and transformation, waterproof, anti-corrosion and thermal insulation, and special engineering. It has more than 40 qualifications, such as Grade A in the engineering design and water conservancy industry, Grade B in engineering survey, installation (repair and test) power facilities license, blasting operation unit license and foreign contracting project qualification, and has been rated as a "national high-tech enterprise" for many years.

Sinohydro has more than 7,800 employees and more than 4,000 professional technical and management personnel. The registered capital is 1.768 billion yuan, and the total assets exceed 19.805 billion yuan. The company has 18 headquarters functional departments, 12 production and operation units, 3 directly affiliated expense units, 4 domestic regional companies and 5 overseas regional companies, with 10 wholly-owned subsidiaries and 5 holding subsidiaries. It has 1 national postdoctoral research station and 1 Xi'an postdoctoral innovation base.

The Third Bureau of China Hydropower has participated in the construction of more than 100 large and medium-sized water conservancy and hydropower projects, such as the Three Gorges Project of the Yangtze River, Xiaolangdi of the Yellow River, Gongbo Gorge, Xiaowan Hydropower Station of the Lancang River, Xiangjiaba Hydropower Station, Haibo Bay Water Conservancy Project of the Yellow River, and Taoyuan Hydropower Station of Yuanshui, and participated in the construction of Fengning Pumped Storage Power Station, Hohhot Pumped Storage Power Station, China-Laos Railway, Guinea Kaileta Water Conservancy Project, Algeria 233MW Photovoltaic Power Station Project and many other key projects at home and abroad. It has won more than 140 national, provincial and ministerial high-quality engineering honors, including "China Construction Engineering Luban Award", "National Quality Engineering Gold Award", "International Milestone Award", "100 Classic and Excellent Projects for the 60th Anniversary of the Founding of New China", "China Electric Power Quality Project", "China Water Conservancy Engineering Quality (Dayu) Award" and "China Steel Structure Gold Award".

The Third Bureau of China Hydropower has carried out a total of 547 scientific research projects, identified and accepted 306 scientific and technological achievements, and 12 "international leading" level; It has won 167 provincial and ministerial science and technology progress awards, 12 special prizes, 31 first prizes and 72 second prizes; 178 provincial and ministerial construction methods have been obtained, and 931 patents have been authorized (102 invention patents); 109 national or industry standards have been compiled, and 65 have been issued for implementation.

Adhering to the enterprise spirit of "unremitting self-improvement and courage to surpass", China Hydropower Third Bureau has won more than 300 honors such as "National May Day Labor Award", "National Advanced Enterprise in Construction Industry", "National Excellent Enterprise in Electric Power Industry", "National Contract-abiding and Trustworthy Enterprise" and "National Advanced Unit of Open and Democratic Management of Factory Affairs".